National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Production KAIZEN Application
Novák, Jaroslav ; Kotek, Luboš (referee) ; Fiala, Alois (advisor)
Theoretical part of this diploma thesis describe Kaizen method and parts of this method, which was developed in Japan after the Second World War. One part of this method is the 3MU concept, that includes definition of absences which influence all companies. One concept of the 3MU is “Muda”, who indicate waste. Practical part is interesting in wastes in sphere of productivity at one of the production department of the Bosch Diesel Ltd. in Jihlava. Individual operations of this department are considered in light of possibility introduction of more-machine operation and the checking of necessity of some machines. As a result is time data evaluation by REFA method and check of possibility introduction of more-machine operation with modification of working processes, calculation of industrial production capacity of some machines and the definition of buffer stocks. This modification of working processes, number of machines and the definition of buffer stocks needs change of layout of production department. At the conclusion there are calculated final costs and savings for implementation of this project.
Production KAIZEN Application
Novák, Jaroslav ; Kotek, Luboš (referee) ; Fiala, Alois (advisor)
Theoretical part of this diploma thesis describe Kaizen method and parts of this method, which was developed in Japan after the Second World War. One part of this method is the 3MU concept, that includes definition of absences which influence all companies. One concept of the 3MU is “Muda”, who indicate waste. Practical part is interesting in wastes in sphere of productivity at one of the production department of the Bosch Diesel Ltd. in Jihlava. Individual operations of this department are considered in light of possibility introduction of more-machine operation and the checking of necessity of some machines. As a result is time data evaluation by REFA method and check of possibility introduction of more-machine operation with modification of working processes, calculation of industrial production capacity of some machines and the definition of buffer stocks. This modification of working processes, number of machines and the definition of buffer stocks needs change of layout of production department. At the conclusion there are calculated final costs and savings for implementation of this project.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.